The AI-native JSON Gantt chart engine. Dependency-free interactive timelines with React, script-tag, CLI, topological DAG solver, and formal JSON schema.
-
Updated
Oct 26, 2026 - TypeScript
The AI-native JSON Gantt chart engine. Dependency-free interactive timelines with React, script-tag, CLI, topological DAG solver, and formal JSON schema.
Open Source Architecture Code Analyzer
Grunt task to extract & inline critical-path CSS from HTML
Inline critical path CSS and async load existing stylesheets
The visual Kanban for long-running AI agents. Watch your agent's plan organize itself: dependencies unlock into Ready, the critical path lights up, the one next move is obvious. Nobody wants to read a markdown plan.
High performance critical css extraction with a great configuration abilities
A browser widget to extract Critical CSS and Full CSS from a page. Can be used via the browser console.
MATLAB implementation of all the Operations Research algorithms and problems solved by me.
Primavera P6 Professional Project Planning Suite - Practical Windows release with complete modules and an easy first launch.
Open-source, dependency-driven scheduling and project controls engine for Microsoft Excel.
Eliminate render-blocking CSS in above-the-fold content
ProjectCraft: an open-source, clean-room project scheduling program (Microsoft Project-style) in pure Rust
Client for critical-css-server. Eliminate render-blocking CSS in above-the-fold content.
Seedcorn (formerly Timeline). Plan it. Run it. Adjust as you go. Share the plan that worked. A self-hosted project planner with a canvas Gantt timeline you can grab, reusable plan templates with a track record, and one-click status slides (editable PowerPoint). Django + React, Apache-2.0.
Java application designed to solve the Critical Path Method (CPM) problem.
Inline critical CSS in HTML page using Puppeteer and Critical-css-parser
MCP server for Microsoft Project: no Java, no Project install. Critical-path engine, DCMA 14-point assessment, verified writes, and a BIM 4D bridge.
Time estimation MCP server for AI agents: PERT, COCOMO II, Monte Carlo, sprint forecasting, token-to-time mapping, cost estimation, and schedule risk tools.
Get critical (above-the-fold) and the rest CSS using Puppeteer
Detects Above the Fold styles on sites and assembles a stylesheet of them.
To associate your repository with the critical-path topic, visit your repo's landing page and select "manage topics."