Skip to content

fix(deps): update misc npm packages - #2348

Merged
cert-manager-prow[bot] merged 1 commit into
masterfrom
renovate/misc-npm-packages
Nov 1, 2026
Merged

cert-manager-prow[bot] merged 1 commit into
masterfrom
renovate/misc-npm-packages

Conversation

@renovate

@renovate renovate Bot commented Oct 28, 2026 •

Copy link
Copy Markdown
Contributor

This PR contains the following updates:

Package Change Age Adoption Passing Confidence
postcss (source) 8.5.31 → 8.5.32 age adoption passing confidence
unist-util-visit 5.1.0 → 5.2.0 age adoption passing confidence

Release Notes

postcss/postcss (postcss)

v8.5.32

Compare Source

  • Fixed Input#origin() without opts.from (by @​wleeaf).
  • Fixed final-word lookup without source offsets (by @​Don-Yin).
  • Fixed explicit start in Warning#toString() (by @​Don-Yin).
  • Fixed Promise semantics in LazyResult#finally() (by @​Don-Yin).
syntax-tree/unist-util-visit (unist-util-visit)

v5.2.0

Compare Source

Add
  • c1ed449 Add support for exit visitors
Performance
  • f57c39f Fix performance around indexOf

Full Changelog: syntax-tree/unist-util-visit@5.1.0...5.2.0


Configuration

📅 Schedule: (in timezone Europe/London)

  • Branch creation
    • At any time (no schedule defined)
  • Automerge
    • At any time (no schedule defined)

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

♻ Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

👻 Immortal: This PR will be recreated if closed unmerged. Get config help if that's undesired.


  • If you want to rebase/retry this PR, check this box

This PR was generated by Mend Renovate. View the repository job log.

@renovate renovate Bot added dependencies Pull requests that update a dependency file ok-to-test labels Oct 28, 2026
@cert-manager-prow cert-manager-prow Bot added dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. size/S Denotes a PR that changes 10-29 lines, ignoring generated files. labels Oct 28, 2026
@netlify

netlify Bot commented Oct 28, 2026 •

Copy link
Copy Markdown

✅ Deploy Preview for cert-manager ready!

Name Link
🔨 Latest commit e4720ba
🔍 Latest deploy log https://app.netlify.com/projects/cert-manager/deploys/6ae3ddf6f1db83bd1cfda7b1
😎 Deploy Preview https://deploy-preview-2348--cert-manager.netlify.app
📱 Preview on mobile
Toggle QR Code...

QR Code

Use your smartphone camera to open QR code link.

To edit notification comments on pull requests, go to your Netlify project configuration.

Signed-off-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
@renovate renovate Bot changed the title fix(deps): update dependency unist-util-visit to v5.2.0 fix(deps): update misc npm packages Oct 29, 2026
@renovate
renovate Bot force-pushed the renovate/misc-npm-packages branch from 8c233a5 to e4720ba Compare October 29, 2026 23:59

@erikgb erikgb left a comment

Copy link
Copy Markdown
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/lgtm
/approve

@cert-manager-prow

Copy link
Copy Markdown
Contributor

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: erikgb

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@cert-manager-prow cert-manager-prow Bot added lgtm Indicates that a PR is ready to be merged. approved Indicates a PR has been approved by an approver from all required OWNERS files. labels Nov 1, 2026
@cert-manager-prow
cert-manager-prow Bot merged commit 069cac3 into master Nov 1, 2026
7 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. dependencies Pull requests that update a dependency file lgtm Indicates that a PR is ready to be merged. ok-to-test size/S Denotes a PR that changes 10-29 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant